Project Information
-
Owner
Des Moines Public School District
-
Location
Des Moines, IA
-
Architect
Shive Hattery / ZBM Architects
-
General Contractor
Miron Construction
-
Engineer
Shive-Hattery, Inc.
-
Square Footage
Existing Building - 279,784Addition - 79,188
-
Baker Group Scope
Mechanical Cost - $5,500,000
-
Year Completed
2005
Baker Group completed a major mechanical construction project at East High School. The renovation consisted of demolition of a single story center area of the existing school, adding a two story addition, with extensive remodeling of the rest of the building including the original 1910 wing. Baker Group performed the plumbing, mechanical, and sheet metal portions of the work. The project was phased into seven different phases, spread out over two and one half years, with every deadline met and kids in school on time.