East High School Renovation

Project Information

  • Owner

    Des Moines Public School District

  • Location

    Des Moines, IA

  • Architect

    Shive Hattery / ZBM Architects

  • General Contractor

    Miron Construction

  • Engineer

    Shive-Hattery, Inc.

  • Square Footage

    Existing Building - 279,784Addition - 79,188

  • Baker Group Scope

    Mechanical Cost - $5,500,000

  • Year Completed

    2005

Baker Group completed a major mechanical construction project at East High School. The renovation consisted of demolition of a single story center area of the existing school, adding a two story addition, with extensive remodeling of the rest of the building including the original 1910 wing. Baker Group performed the plumbing, mechanical, and sheet metal portions of the work. The project was phased into seven different phases, spread out over two and one half years, with every deadline met and kids in school on time.