Wolfe Eye Clinic Remodel

Wolfe Eye Clinic Remodel

In March of 2019, Wolfe Eye Clinic needed a complete remodel of their lower level and a remodel of a couple rooms in the upper level of the building. The goal of the remodel was to remove the existing surgery center and turn the lower level into more exam rooms for doctors and patients. 

Baker Group worked with the Wolfe Eye Clinic to install new lighting and lighting control systems, new structured cabling systems, new power distribution and emergency power systems and a new fire alarm system in their building. The clinic wished to remain fully operational during their remodel so this presented some challenges for the crew working on the project. Baker Group worked hand-in-hand with Wolfe Clinic and Hansen Co. to ensure there was no downtime to their operations while construction was happening.